It would be great if there is an option to select a computation that needs to be executed after a Dynamic Action of type Refresh. So being able to select a page item that needs to be refresh as well as the computation that is present on the page item.
Right now I have to put the same code as the computation in a dynamic action to be able to achieve this result.