This demo shows how to patch all the nodes of a RAC database collectively. In this methodology all the nodes are shut down and the patch is applied on all of them at the same time. You can follow the same instructions and patch the nodes individually using the Rolling methodology.
Duration: 20 minutes
Release Date: 01-APR-2010